Loading...
HomeMy WebLinkAbout0117662-Building (canopy) G OSHKOSH ON THE WATER Job Address 1255 W 18TH AVE CITY OF OSHKOSH No 117662 BUILDING PERMIT - APPLICATION AND RECORD OWner VILLA ST THERESA INC Create Date 12/20/2005 Designer Contractor OSHKOSH TENT & AWNING CO INC Category 255 - Awnings/Canopies Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size -~ Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projecton I Finished/Living Bedrooms 0 Stories Canopies 0 Garage ~Sq.Ft. Baths Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Penn it Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature Apartment Building /Install a 10' Wide x 42" tall x 18" long entrance canopy. 'Late Permit. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,172.00 Plan Approval $0.00 Penn it Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 12/20/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1307310300 In tI1e performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described in tI1is permit a 'catlon within an easement, the Ci strongly urges the permit applicant to contact tI1e easement holder(s) and to e necessary a efore ng such activity. Date Signature Address 110 E FERNAU AVE OSHKOSH WI 54901 . 0000 Telephone Number 235-3170 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. . ... ....-.,. ........ . NON -. J(¿~frtl¥itr!ip... .1 ? . It) (J) x¡f ,J?ðf .... qÕ. \~