Loading...
HomeMy WebLinkAbout0117619-Building (windows) e OSHKOSH ON THE WATER Job Address 1824 FABRY ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 111619 Owner RICHARD B HABERKORN Create Date 12/19/2005 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I Finished/Living Canopies Garage ~Sq.Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures 0 Use/Nature SFRIlnstall 9 vinyl replacement windows, same size - No Structural changes of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,451.00 Plan Approval $0.00 Permit Fee Paid $68.00 Park Dedication $0.00 Issued By: Date 12/19/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1409942300 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 106 S MAIN STREET Agent/Owner OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.