HomeMy WebLinkAbout0117619-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 1824 FABRY ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
111619
Owner RICHARD B HABERKORN
Create Date
12/19/2005
Designer
Contractor
LUECKS HOME IMPROVEMENT INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms Stories
Baths 0
Size
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
D Projection I
Finished/Living
Canopies
Garage
~Sq.Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
0
Use/Nature SFRIlnstall 9 vinyl replacement windows, same size - No Structural changes
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$8,451.00 Plan Approval
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Issued By:
Date 12/19/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1409942300
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 106 S MAIN STREET
Agent/Owner
OSHKOSH
WI 54902 - 6084
Telephone Number
235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.