Loading...
HomeMy WebLinkAbout0117622-Building (siding) e OSHKOSH ON THE WATER Job Address 614W11THAVE CITY OF OSHKOSH No 117622 BUILDING PERMIT -APPLICATION AND RECORD Owner MARIE NIKOLAUS Create Date 12/19/2005 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I Canopies Finished/Living Garage ~Sq.Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penmit Not Required Flood Plain No Height Penmit Not Required Park Dedication Not Required 1# Dwelling Units -----.!1 1# Structures -----.!1 Use/Nature SFRI Replace wood siding on house with Vinyl siding, wrap soffit and fascia, and install 7 replacement windows. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,800.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00 Issued By: Date 12/19/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld 1# 1303560000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 AgenUOwrer OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.