Loading...
HomeMy WebLinkAbout0117613 P e OSHKOSH ON THE WATER Job Address 451 453 N WESTFIELD ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 117613 Owner 451 453 WESTFIELD STREET LLC Plan Contractor MOREMAN PLUMBING Create Date 12/16/2005 Category 411 - Residential-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Rool Drain Misc. Fixtures 0 0 0 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink 0 0 0 0 0 0 0 0 0 Wait St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ 0 Flr/Wst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Sterilizer Dip Well Drink Ftn UseJNature 01 Work I'~~ ~""m" ~~ Valuation Issued By Sanitary Sewer Size Storm Sewer Water Service $700.00 Plan Approval $0.00 Material Permit Fees Type # 0 0 0 0 0 Conn. Type o. 0 0 0 0 $20.00 0 Permit Voided I Parcelld # 1611250000 Date 12/16/2005 In the performance of this work. I agree to perform all work pursuant to nules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is nota party. ilyou perfonm the work described in this penmit appiication within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 231-9191 Address PO BOX 1325 AgenVOwner OSHKOSH WI 54903 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.