HomeMy WebLinkAbout0117613 P
e
OSHKOSH
ON THE WATER
Job Address 451 453 N WESTFIELD ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
117613
Owner 451 453 WESTFIELD STREET LLC
Plan
Contractor MOREMAN PLUMBING
Create Date 12/16/2005
Category 411 - Residential-Water Heaters
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Rool Drain
Misc.
Fixtures
0
0
0
0
0
0
1
0
0
0
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
0
0
0
0
0
0
0
0
0
Wait St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink ~
0 Flr/Wst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Sterilizer
Dip Well
Drink Ftn
UseJNature
01 Work
I'~~ ~""m" ~~
Valuation
Issued By
Sanitary Sewer
Size
Storm Sewer
Water Service
$700.00
Plan Approval
$0.00
Material
Permit Fees
Type
#
0
0
0
0
0
Conn. Type
o.
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1611250000
Date 12/16/2005
In the performance of this work. I agree to perform all work pursuant to nules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is nota party. ilyou perfonm the work
described in this penmit appiication within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 231-9191
Address PO BOX 1325
AgenVOwner
OSHKOSH
WI 54903 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.