Loading...
HomeMy WebLinkAbout0117609-Building (siding) e OSHKOSH ON THE WATER Job Address 821 MONROE ST CITY OF OSHKOSH No 117609 BUILDING PERMIT - APPLICATION AND RECORD Owner PATRICIA A BERSCH Create Date 12/16/2005 Designer Contractor OUTSIDER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies ~ Garage ~Sq.Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penmit Not Required Flood Plain Height Penmit Park Dedication # Dwelling Units ----.!! # Structures 0 Use/Nature SFR/Installing foam and vinyl siding on the house. No electrical work is being done in association with the siding work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: val~ Issued By: "--- $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 12/1612005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1107810000 In the pertonnance of this work I agree to pertonn all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertonn the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement :~~~~::~n~ t~l ne~~;::val~ before starting such activity. Date ~ Agent/Owner ( Address 426 BOYD ST OSHKOSH WI 54902 - 0000 Telephone Number 426-0120 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if.the inspection is not performed within two business days from the time the project is ready.