HomeMy WebLinkAbout0117615 B
e
OSHKOSH
ON THE WATER
Job Address 1508-1550 S KOELLER ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117612
OWner 2323 EAST CAPITOL LLC
Create Date
12/15/2005
Designer
Contractor
OWNER
Category
223 - Alteration Offices, Banks, Professional
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----.2 Sq. Ft.
----.2 Sq. Ft.
Rooms
a
Height a Ft.
0 Projection I
Finished/Living
Bedrooms
Stories 1
Canopies
Garage
----.2 Sq. Ft.
Baths
a
Signs
a
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain -
# Dwelling Units ~
Height Permit
Park Dedication
# Structures
~
Use/Nature 1524 S Koeller/ libertY Tax Servicel Alterations to convert doorway between two rooms into a pass through between the same rooms.
of Work Misc. alterations to flooring, wall repair. painting for new tenant.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$3,400.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 12/16/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1308500400
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the CI shkosh h no authority to enforce easement restrictions of which It is not a partY, if you perform the work
described i this ermit appli tion within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and 0 . n cessary approvals before starting such activity. 'flI.J =. \ I ,
Signature Date [JIf -tl. OL '" ,
Agent/Owner
)
Address
Oshkosh
"""- 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone'
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may
continue if the inspection is not performed within two business days from the time the project is ready.