Loading...
HomeMy WebLinkAbout0117614-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 811 GREENWOOD CT CITY OF OSHKOSH No 117614 PLUMBING PERMIT -APPLICATION AND RECORD OWner CHARLES AIMARIL PERRY Plan Create Date 12/16/2005 Category 441 -Industrial-Water Heaters Contractor KOCH PLUMBING Bathtub 0 Shower 0 Water Softner 0 Wait.St. Whirlpool 0 Floor Drain 0 Local Waste ---..Q Ice Chest Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink Toilet 0 Disposal 0 Bidet 0 Sculry Sink Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink Site Drain 0 Breakrm Sink ---..Q DipWell 0 F Prep Sink RoolDrain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink Misc. 0 Fixtures UseJNature r~~'M~.oæ" ^,cr 01 Work Size Material Sanitary Sewer 0 Shamp Sink ---..Q Coffee Maker 0 0 FlrlWst Sink 0 Int Grease Trap ---..Q 0 Catch Basin 0 Ext Grease Trap 0 0 Wash Ftn ---..Q RPZValve 0 0 Urinal 0 Eye Wash Statn 0 0 Standp Rec ---..Q Wtr Sewer Mtrs 0 0 Ice Maker ---..Q Deduct Meters ---..Q 0 Gar Drain 0 Wtr Usage Mtrs 0 ---..Q Soda Disp 0 Storm Sewer Water Service Valuation $600.00 $0.00 Plan Approval Permit Fees Date 12/16/2005 Issued By Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 D Permit Voided I Parcelld # 1522830000 In the performance of this work. I agree to perform ali work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before startjng such activity. Signature Date Address 2005 DOTY ST AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type 01 Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue il the inspection is not performed within two business days from the time the project is ready.