HomeMy WebLinkAbout0117617-Plumbing (added fixture)
~
OSHKOSH
ON THE WATER
Job Address 2202 ASHLAND ST
CITY OF OSHKOSH
No
117617
PLUMBING PERMIT - APPLICATION AND RECORD
Owner SHOWCASE CUSTOM HOMES INC
Create Date 12/15/2005
Category 410 - Residential-Interior
Plan
Contractor MOREMAN PLUMBiNG
Bathtub 0 Shower 0 Water Softner 0 Wait.S!. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 FloorDrain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 1 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
ofWork
Valuation
Issued By
Work in addition to permit #115029 instali sanitary ejector for building subdrain. (Debit Account)
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1516290000
$500.00
$0.00
$20.00 D Permit Voided I
Plan Approval
Permit Fees
Date 12/19/2005
in the performance of this work. I agree to perform ali work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Address PO BOX 1325
Signature
Date
AgenUOwner
OSHKOSH
WI 54903 - 0000
Telephone Number 231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.