Loading...
HomeMy WebLinkAbout0117595-Building (roof) e OSHKOSH ON THE WATER Job Address 1703DOEMELST CITY OF OSHKOSH No 117595 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN W BEHM ETAL Create Date 12/14/2005 Designer Contractor STEVE WIRTZ CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----.2 Sq. Ft. Bedrooms Stories Garage ----.2 Sq. Ft. Baths 0 D Projection I Canopies Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFRI Reroofing the house. No stnuctural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: r $4,900.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 12/15/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 1514200000 In the performance of this work I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signatur?~ ~ Agent/Owner Date I). '/5"~ClÇ Address 684 PRAIRIE PKWY FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-6063 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone 'Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.