HomeMy WebLinkAbout2005-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 604 REIGHOW ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117578
Owner SGOTT A/SUSAN M DELORME
Greate Date
12/12/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Buiiding
0 Sign
0 Ganopy
0 Fence
0 Raze
Zoning
Ctass of Const:
Size
Unfinished/Basement ----.2 Sq. Ft. Rooms Height 0 Ft.
Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories
Garage ----.2 Sq. Ft. Baths 0
0 Projection I
Canopies ----.2
Signs
0
Foundation
. Poured Goncrete 0 Floating Slab
0 Goncrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature ~fr / replace 6 windows same size, same iocation, no structural changes
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$8,000.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 12/12/2005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0610860000
In the performance of this work I agree to perform aii work pursuant to rules govemlng the described construction.
Whiie the Gity of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the Gity strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature 5¡¡")Ú'-o. Q+,yr--f!
AgenUOwner
Date
!óìh;¡/o5
Address 604 REiGHOW ST
OSHKOSH
WI 54902 - 5532
Telephone Number
Q!Jð4;;f, 3~1J ç
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue ifthe inspection is not performed within two business days from the time the project is ready.