Loading...
HomeMy WebLinkAbout0117569 B e OSHKOSH ON THE WATER Job Address 1951 S OAKWOOD RD CITY OF OSHKOSH No 117569 BUILDING PERMIT -APPLICATION AND RECORD OWner PAUL G/ALEIDA G PARKER Create Date 10/31/2005 Designer Contractor JJ GEFFERS INC Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. ----2 Sq. Ft. Rooms Height 0 Ft. 0 Projection I Canopies 0 Finished/Living Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ----<1 # Structures ----<1 Park Dedication Use/Nature ofWork FR/ Switching the direction of the existing stairway to the basement. Opening the walls to provide 4 foot knee wall around the staircase 1-.'-'. "'~ =m. HVAC Contractor Plumbing Contractor Electric Contractor / $6,438.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 12/12/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1331210000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penni! application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 208 E SNELL RD Agent/OWner OSHKOSH WI 54901 - 0000 Telephone Number 235-1422 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. e OSHKOSH ON THE WATER Job Address 1951 S OAKWOOD RD CITY OF OSHKOSH No 117569 BUILDING PERMIT - APPLICATION AND RECORD OWner PAUL G/ALEIDA G PARKER Create Date 10/31/2005 Designer Contractor GEFFERS REMODELING Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----2 Sq. Ft. Bedrooms Stories Garage ----2 Sq. Ft. Baths 0 0 Projection I Canopies 0 Signs ----2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature SFR/ Switching the direction of the existing stairway to the basement. Opening the walls to provide 4 foot knee wall around the staircase of Work between the kitchen and living room. HVAC Contractor Plumbing Contractor Electric Contractor Fees: val~ Issued By: $6,438.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Date 12/12/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1331210000 In the performance of this work I agree to perform II work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to force easement restrictions of which it is not a party. if you perform the work described in this permit application within a easement, the City strongly urges the permit applicant to contact the easement holder(s) a d t e any necessary rovals before starting such activity. Agent/Owner OSHKOSH Da'7¿7 J.2 -!) - 0<:"" WI 54901 - 0000 Telephone Number 235-1422 Signature To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.