Loading...
HomeMy WebLinkAbout0117560 B e OSHKOSH ON THE WATER Job Address 1560 TAFT AVE CITY OF OSHKOSH No 117560 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH Create Date 12/09/2005 Designer Cr Meyer Contractor CR MEYER Category 260 - City of Oshkosh-New Plan G7-94-1005 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Finished/Living ~Sq.Ft. ~Sq.Ft. 0 Projection I Unfinished/Basement Canopies 0 Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures 0 Use/Nature CITY - Above Grade work for new pool equipment building as per State Approved Plans, Trans ID # 1208386 of Work Plumbing Contractor HVAC Contractor Electric Contractor $343,750.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 12/09/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1608690000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 895 W 20TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-235-3350 x219 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.