HomeMy WebLinkAbout0117560 B
e
OSHKOSH
ON THE WATER
Job Address 1560 TAFT AVE
CITY OF OSHKOSH
No
117560
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH
Create Date
12/09/2005
Designer
Cr Meyer
Contractor
CR MEYER
Category
260 - City of Oshkosh-New
Plan G7-94-1005
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Finished/Living
~Sq.Ft.
~Sq.Ft.
0 Projection I
Unfinished/Basement
Canopies
0
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
0
Use/Nature CITY - Above Grade work for new pool equipment building as per State Approved Plans, Trans ID # 1208386
of Work
Plumbing Contractor
HVAC Contractor
Electric Contractor
$343,750.00 Plan Approval
$0.00 Permit Fee Paid
$0.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 12/09/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1608690000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 895 W 20TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number
920-235-3350 x219
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.