Loading...
HomeMy WebLinkAbout0117562 P e OSHKOSH ON THE WATER Job Address 1940 OLIVE ST CITY OF OSHKOSH No 117562 PLUMBING PERMIT - APPLICATION AND RECORD Contractor FORREST PLUMBING LLC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures 0 0 0 0 0 0 0 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 1 0 0 0 0 0 0 0 0 WaterSoftner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Owner SHIRLEY WILKE Create Date 12/09/2005 Category 410- Residential-Interior Plan 0 0 0 0 0 0 0 0 0 WaitSt Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 0 0 0 0 0 0 0 0 Shamp Sink 0 FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap ~ RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Sterilizer Dip Well Drink Ftn FRilnstalling shower' (debit acct) Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Stonn Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1216030000 Use/Nature of Work Valuation Issued By $3,500.00 Plan Approval $0.00 Permit Fees Date 12/09/2005 $20.00 0 PerrTI~\lo~ In the perfonnanee of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perforrn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 5210 N LOOP RD AgenVOwner LARSEN WI 54947 - 0000 Telephone Number 920-836-3986 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not peñormed within two business days from the time the project is ready.