HomeMy WebLinkAbout2005-Building (landing & steps) VOID
e
OSHKOSH
ON THE WATER
Job Address 1443 WITZEL AVE
CITY OF OSHKOSH
No
117538
BUILDING PERMIT - APPLICATION AND RECORD
VOID
OWner FREDERICK 0 PETZOLD
Create Date
12/0812005
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms --2 Height 0 Ft.
Bedrooms Stories
Baths 0
0 Projection I
Finished/Living
Canopies ~
Garage
~Sq.Ft.
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
~
Park Dedication
UselNature SFRI Constructing a 4'x4'Ianding and steps off the front exit. A minimum of 48" of frost protection is required.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$800.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Fees; Valuation
Issued By:
Date 12/0812005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld# 0611940000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1224 W SOUTH PARK AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
231-2114
To schedule Inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access Into Building if Secure (how do we gain entry); your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time.the project is ready.
e
OSHKOSH
ON THE WATER
Job Address 1443WITZELAVE
CITY OF OSHKOSH
No
117538
BUILDING PERMIT - APPLICATION AND RECORD
Owner FREDERiCK 0 PETZOLD
Create Date
12/08/2005
Designer
Contractor
DAN V BiNDER CONSTRUCTION
Category
141 - Exterior Remodeilng
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature
of Work
FRI Constructing a 4'x4' landing and steps off the front exit. A minimum of 48" of frost protection is required.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$800.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 12/08/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0611940000
In the performance of this work I agree to perform ail work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appilcation within an easement, the City strongly urges the permit appilcant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1224 W SOUTH PARK AVE
AgenUOwner
OSHKOSH
Wi 54902 - 0000
Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project Is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.