HomeMy WebLinkAbout0117542-Building
e
OSHKOSH
ON THE WATER
Job Address 1100EMURDOCKAVE
CITY OF OSHKOSH
No
117542
BUILDING PERMIT - APPLICATION AND RECORD
Owner ST ANDREW EVAN LUTH CHURCH
Create Date
12/07/2005
Designer
HGM
Contractor
OWNER
Category
207 - Addition Churches & other Reiigious
Plan R1-99-1105
. Buiiding
0 Sign
0 Canopy
0 Fence
0 Raze
Type
Zoning
R-1
Class of Const: VB
Size 20' x 74'
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories 1
Canopies 0
Garage
~ Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
H~ight Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature
of Work
hurch /1750 sq It Addition as per State Approved Pians - Trans ID # 1202425
HVAC Contractor
VANASTEN HTG & SHEET METAL
Plumbing Contractor
DR. HANSEN PLBG.
Electric Contractor
.00 Plan Approval
$0.00 Permit Fee Paid
$412.00 Park Dedication
$0.00
Issued By:
Date 12/08/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1514817400
In the performance of this work I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature ~ 1!J, ~
Agent/Owner
Date
/2../B/DS"
Address 1100EMURDOCKAVE
OSHKOSH
WI 54901 - 2432
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.