Loading...
HomeMy WebLinkAbout0117542-Building e OSHKOSH ON THE WATER Job Address 1100EMURDOCKAVE CITY OF OSHKOSH No 117542 BUILDING PERMIT - APPLICATION AND RECORD Owner ST ANDREW EVAN LUTH CHURCH Create Date 12/07/2005 Designer HGM Contractor OWNER Category 207 - Addition Churches & other Reiigious Plan R1-99-1105 . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Type Zoning R-1 Class of Const: VB Size 20' x 74' Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories 1 Canopies 0 Garage ~ Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No H~ight Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature of Work hurch /1750 sq It Addition as per State Approved Pians - Trans ID # 1202425 HVAC Contractor VANASTEN HTG & SHEET METAL Plumbing Contractor DR. HANSEN PLBG. Electric Contractor .00 Plan Approval $0.00 Permit Fee Paid $412.00 Park Dedication $0.00 Issued By: Date 12/08/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1514817400 In the performance of this work I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature ~ 1!J, ~ Agent/Owner Date /2../B/DS" Address 1100EMURDOCKAVE OSHKOSH WI 54901 - 2432 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.