HomeMy WebLinkAbout0117536 B
0 CITY OF OSHKOSH No 117536
OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD
ON THE WATER
Job Address 1012 VAN BUREN AVE OWner GERALD R SCHROEDER Create Date 12/08/2005
Designer
Contractor
STERLING CONSTRUCTION & RESTORATION
Category
140 -Interior Remodeling
Plan
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Type
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Penmit
Park Dedication
# Dwelling Units --------2
# Structures
0
~:~~~~ure d~~:~~:~~~~:~er damaged drywall and insulation where needed in the kitchen. bathrooms, and bedroom. Installation of new
HVAC Contractor
Plumbing Contractor
KOCH PLUMBING
Electric Contractor
Fees: Valuation
Issued By: ~
$25,000.00 Plan Approval
$0.00 Permit Fee Paid
$139.00 Park Dedication
$0.00
Date 12/08/2005
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1607620000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
:~~d:~:~r:fØ~~e starting such activity. Dateý 1;< 8~
AgenUOwner
Address PO BOX 1933
Oshkosh
WI 54903 - 0000
Telephone Number
651-9867
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not peñormed within two business days from the time the project is ready.