Loading...
HomeMy WebLinkAbout0117537-Building (foundation) e OSHKOSH ON THE WATER Job Address 1934 CLlFFVIEW CT CITY OF OSHKOSH No 117537 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID C/ANN K PATEK Create Date 12/08/2005 Designer Contractor DAN V BINDER CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement --2 Sq. Ft. Rooms Finished/Living --2 Sq. Ft. Bedrooms Garage --2 Sq. Ft. Baths Height 0 Ft. D Projection I Stories Canopies 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Penmit Park Dedication # Dwelling Units ------2 # Structures 0 Use/Nature "FRI Raising the existing foundation on the rear of the house by Raise Rite Atlas Pier system. Replace Windows and replace drywall in of Work he sun room. All work shall comply with all applicable codes. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,500.00 Plan Approval $0.00 Permit Fee Paid Issued By: cp; $68.00 Park Dedication $0.00 Date 12/08/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1525970000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement ~~~~~::~:nd to ~:;es~::Zre starting such activity. Date /.7- ~ -(') ç- Agent/Owner Address 1224 W SOUTH PARK AVE OSHKOSH WI 54902 - 0000 Telephone Number 231-2114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone 'Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.