HomeMy WebLinkAbout0117527 P
CITY OF OSHKOSH
e
OSHKOSH
ON THE WATER
Job Address 1636 OHIO ST
No
117527
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor J RASMUSSEN PLUMBING INC
OWner KAY M BOSS
Category 411 - Residential-Water Heaters
Create Date 12/07/2005
Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
a
a
a
a
a
a
1
a
a
a
a
a
a
a
a
a
a
a
a
WaterSoftner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
a
a
a
a
a
a
a
a
a
Wail.SI. a
Ice Chest a
Exam Sink a
Sculry Sink a
Hand Sink a
Plaster Sink a
Surgeons Sink a
F Prep Sink a
Serv Sink a
Shamp Sink a
FlriWst Sink a
Catch Basin a
Wash Ftn a
Urinal a
Standp Rec a
Ice Maker a
Gar Drain a
Soda Disp a
Coffee Maker a
Int Grease Trap a
Ext Grease Trap a
RPZValve a
Eye Wash Statn a
Wtr Sewer Mtrs a
Deduct Meters a
Wtr Usage Mtrs a
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Dip Well
Drink Ftn
UseiNature
of Work
r>"'~~" ~ w^,rn _Œ'
Valuation
Size
Material
Type
# Conn. Type '
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
$20.00 0 Pel111itVoided I
Parcelld #
1301690000
Sanitary Sewer
Storm Sewer
Water Service
$600.00
Plan Approval
$0.00
Issued By
Date 12/07/2005
Permit Fees
In the perfol111ance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany. if you perform the work
described in this permit application within an easement. the City strongiy urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 920-233-6747
Agent/Owner
OSHKOSH
WI 54904 - 0000
Address 1914 GREENBRIAR TRL
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.