Loading...
HomeMy WebLinkAbout0117526 P ~ OSHKOSH ON THE WATER Job Address 100 W COUNTY RD Y CITY OF OSHKOSH No 117526 PLUMBING PERMIT. APPLICATION AND RECORD RELOCATE WATER LATERAL SERVICE FOR LANDFILL OFFICE/UTILITY FACILITY(CK#97513) Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 8" Plastic Lateral 1 Relay 0 0 0 Parcelld # 0 1268510000 Contractor VINTON CONSTRUCTION CO Bathtub 0 Shower 0 Water Softner Whirlpool 0 Floor Drain 0 Local Waste Lavatory 0 Lndry Tray ---.IJ Clothes Wshr Toilet 0 Disposal 0 Bidet Res. Sink 0 Dishwasher 0 Beer Tap Bar Sink 0 Sump Pump 0 Lab Sink Water Heater 0 Classrm Sink 0 Sterilizer Site Drain 0 Breakrm Sink 0 Dip Well Roof Drain 0 Ejector/Grind 0 Drink Ftn Misc. 0 Fixtures Use/Nature ofWork Valuation $50,000.00 Plan Approval $0.00 Date~ Issued By Owner WINNEBAGO COUNTY Create Date 12/07/2005 Category 430 -Industrial-Exterior (laterals) Plan 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 0 Serv Sink 0 Soda Disp 0 Permit Fees $50.00 0 Permit Voided I In the performance of this work, I agree to perform all work pursuant to rules 90verning the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure ~approvals before starting such activity. Signature ~ W. AgenUOwner Address POBOX 1987 MANITOWOC Date /2-07-0:;:- WI 54221 - 1987 Tetephone Number 920-374-0227 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.