Loading...
HomeMy WebLinkAbout0117512 P G OSHKOSH ON THE WATER Job Address 870 W SOUTH PARK AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner POKLASNY INC Category 401 - Residential-Exterior (laterals) Contractor M P KELLY No 117512 Create Date 12/06/2005 Plan Bathtub 0 Shower 0 Water Softner 0 Wait.SI. Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink Toilet 0 Disposal 0 Bidet ----.2 Sculry Sink Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink Bar Sink 0 Sump Pump ----.2 Lab Sink 0 Plaster Sink Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink Misc. 0 Fixtures Use/Nature r~~"-- of Work Size Material Sanitary Sewer 4" Plastic ----.2 Shamp Sink ----.2 0 FlrlWst Sink 0 0 Catch Basin ----.2 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker ----.2 Int Grease Trap ----.2 Ext Grease Trap ----.2 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs ----.2 Deduct Meters 0 Wtr Usage Mtrs 0 Storm Sewer Water Service Type # Conn. Type Lateral 1 Relay 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $50.00 0 Permit Voided I Parcelld # 1310260000 Valuation Permit Fees $3.500.00 $0.00 Plan Approval Issued By Date 12/06/2005 In the performance of this work, I agree to perform all work pursuant to nules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.