HomeMy WebLinkAbout0117518-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1159W 6TH AVE
Contractor MERTEN PLUMBING
CITY OF OSHKOSH
No
117518
PLUMBING PERMIT - APPLICATION AND RECORD
OWner WILLIAM J KREBS
Create Date 12/06/2005
Cate90ry 411 - Residential-Water Heaters
Plan
Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/WstSink 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin ~
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn ~
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec ~
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker ~
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain ~
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp ~
Misc. 0
Fixtures
UseJNature rffi'~w^,,'~m
of Work
Coffee Maker ~
Int Grease Trap ~
Ext Grease Trap ~
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Size
Material
Type
#
Conn. Type
Storm Sewer
0
0
0
0
0
0
0
0
0
0
Sanitary Sewer
$670.00
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
0608291100
Water Service
Valuation
Issued By
Date 12/0612005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
OSHKOSH
WI 54901 - 0000
Telephone Number 231-6795
Address 1076 COZY LN
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.