Loading...
HomeMy WebLinkAbout2005-Plumbing (disposal) 0 OSHKOSH ON THE WATER Job Address 472 SUNNYBROOK DR CITY OF OSHKOSH No 117477 PLUMBING PERMIT - APPLICATION AND RECORD Owner PAULA K BRITTON Contractor M P KELLY Category 410 - Residential-Interior Create Date 12/01/2005 Plan Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 Whirlpoot 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 0 Disposal 1 Bidet 0 sculry Sink 0 Wash Ftn 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature rrn ,~"'~ of Work Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZValve 0 Eye Wash statn ~ Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Size Material Type # 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer 0 0 0 0 0 0 0 0 0 0 Parcelld # 1622800000 Water Service Vatuation $379.00 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Issued By Date 12/05/2005 In the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAiN ST Agent/Owner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.