Loading...
HomeMy WebLinkAbout0117480 H ~ OSHKOSH ON THE WATER Job Address 2708 STONEY BEACH ST CITY OF OSHKOSH No 117480 HVAC PERMIT. APPLICATION AND RECORD Owner MARK/DEBORAH ROLFING REV TRUST Create Date 10/06/2005 Plan Contractor MARX MECHANICAL I-I Gas I I Oil Fuel System ~New I U Forced Air U Radiant I Electric I-I HotWater I Chimney Type () Chimney A ( ) Chimney B Heat Loss ( ) As Approved ( ) Existing BTU Rate ( ) As Per Plan ( ) Variable Category 500 - Residential-Heating & Ventilating I I Soiar I I Solid I I Electric n Replace n Other U Vent U Steam I I Suppi. ~ AlC I I I Con. Bumer I ( ) Not Applicable . Direct Vent . NotAppiicabie . Other Value Value Use/Nature FR/ convert attached garage into Family Room. . Note: Owner must provide the required Parking Screening to the North of the existing of Work paved area adjacent to the attached garage uniess a variance is secured to waive this requirement."Eiectrical pemit previously issued to Nitzke. $12,665.00 Plan Approval $0.00 Permit Fee Paid $182.00 Fees: Valuation Issued By: fJ:ll/ Date 12/05/2005 0 Permit Voided I Parcelld # 1414770000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 4535 STATE ROAD 91 OSHKOSH WI 54904 - 6304 Telephone Number 920-235-6510 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.