HomeMy WebLinkAbout2005-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 127 W SOUTH PARK AVE
CITY OF OSHKOSH
No
117502
BUILDING PERMIT. APPLICATION AND RECORD
Owner us BANK NA TRUSTEE
Create Date
12/05/2005
Contractor
BADGER ROOFING & SIDING
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----.-9. Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----.-9. Sq. Ft. Bedrooms Stories
Garage ----.-9. Sq. Ft. Baths 0
D Projection I
Canopies 0
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Not Required
Flood Plain
Height Penmit
Park Dedication
# Dwelling Units ----9.
# Structures
0
Use/Nature SFRITear off and repiace existing roofing on house. Change some interior doors and kitchen cabinets! NO STRUCTURAL WORK.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$3,500.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 12/05/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0303860000
In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1020 WINNEBAGO AVE
Agent/Owner
Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.