Loading...
HomeMy WebLinkAbout2005-Plumbing (toilet) e OSHKOSH ON THE WATER Job Address 1922 PLYMOUTH ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD OWner DOROTHY HA2EN Contractor SAMMONS PLUMBING Category 410 - Residential-Interior Bathtub 0 Shower 0 Water Softner 0 Wait.SI. 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin ~ Toilet 1 Disposal 0 Bidet 0 SculrySink 0 Wash Ftn ~ Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec ~ Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp ~ Misc. 0 Fixtures Use/Nature f'" ~,~ wm of Work No 117490 Create Date 12/05/2005 Plan Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs Size Material Sanitary Sewer Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 D Permit Voided I Storm Sewer Water Service Valuation $250.00 Plan Approval $0.00 Permit Fees Issued By Date 12/05/2005 In the performance of this work, I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy, if you perfonn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522W.MURDOCKAVE AgenUOwner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Parcelld # 1216610000 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i,e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.