Loading...
HomeMy WebLinkAbout0117479-HVAC ~ OSHKOSH ON THE WATER Job Address 3190 OLD ORCHARD LN CITY OF OSHKOSH No 117479 HVAC PERMIT - APPLICATION AND RECORD Owner MARK H/KRISTEN LASKY Create Date 09/08/2005 Plan Contractor GR PETERS MECHANICAL Category 500 - Residential-Heating & Ventiiating Fuel 1 I Solar 1 I Solid ~ Forced Air I 1 Electric U Radiant I 1 Hot Water () Chimney B 1 I Eiectric [7] Replace U Steam 1 I Suppl. n Other System 1"'1 Gas n New I 1 Oil I Chimney Type K) Chimney A . Direct Vent U f>JC 1 1 I Con. Burner 1 ( ) Not Appiicable U Vent . Existing ( ) Variabie ( ) Not Appiicable . Other Value Heat Loss K ) As Approved K) As Per Plan Value BTU Rate Use/Nature FRI Replace furnace, install additionai duct work for addition. No Chimney Liner Being installed --Where an appiiance is penmanentiy of Work isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior f the CN and to provide the appliance or appiiances served with the req. draft. Fees: Valuation $7,000.00 Plan Approval $0.00 Penmit Fee Paid $110.00 Issued By: Date 12/05/2005 0 Permit Voided I Parcelld # 1417480000 in the perfonmance of this work, I agree to perform all work pursuant to ruies governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit appiication within an easement, the City strongly urges the permit appiicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 730 HAWTHORNE OR OMRO WI 54963-0 Telephone Number 920-685-0990 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.