HomeMy WebLinkAbout0117479-HVAC
~
OSHKOSH
ON THE WATER
Job Address 3190 OLD ORCHARD LN
CITY OF OSHKOSH
No
117479
HVAC PERMIT - APPLICATION AND RECORD
Owner
MARK H/KRISTEN LASKY
Create Date 09/08/2005
Plan
Contractor
GR PETERS MECHANICAL
Category 500 - Residential-Heating & Ventiiating
Fuel
1 I Solar
1 I Solid
~ Forced Air
I 1 Electric
U Radiant
I 1 Hot Water
() Chimney B
1 I Eiectric
[7] Replace
U Steam
1 I Suppl.
n Other
System
1"'1 Gas
n New
I 1 Oil
I
Chimney Type K) Chimney A
. Direct Vent
U f>JC 1
1 I Con. Burner 1
( ) Not Appiicable
U Vent
. Existing
( ) Variabie
( ) Not Appiicable
. Other
Value
Heat Loss
K ) As Approved
K) As Per Plan
Value
BTU Rate
Use/Nature FRI Replace furnace, install additionai duct work for addition. No Chimney Liner Being installed --Where an appiiance is penmanentiy
of Work isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior
f the CN and to provide the appliance or appiiances served with the req. draft.
Fees: Valuation
$7,000.00
Plan Approval
$0.00
Penmit Fee Paid
$110.00
Issued By:
Date 12/05/2005
0 Permit Voided I
Parcelld # 1417480000
in the perfonmance of this work, I agree to perform all work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit appiication within an easement, the City strongly urges the permit appiicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
730 HAWTHORNE OR
OMRO
WI 54963-0
Telephone Number
920-685-0990
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.