HomeMy WebLinkAbout0117475-Plumbing (water heater)
e CITY OF OSHKOSH No 117475
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1506 E NEVADA AVE Owner GILBERT/SHARON RODERICK Create Date 11/30/2005
Contractor MPKELLY Category 411 - Residential-Water Heaters Plan
0 Shamp Sink ~ Coffee Maker 0
0 FlrlWst Sink ~ Int Grease Trap ~
0 Catch Basin ~ Ext Grease Trap 0
0 Wash Ftn 0 RPZ Valve 0
0 Urinal ~ Eye Wash Statn 0
0 Standp Rec ~ Wtr Sewer Mtrs 0
0 Ice Maker 0 Deduct Meters 0
0 Gar Drain ~ Wtr Usage Mtrs 0
0 Soda Disp 0
Bathtub 0 Shower 0 Water Softner 0 Wait St.
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink
Toilet 0 Disposal 0 Bidet 0 Sculry Sink
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink
Misc. 0
Fixtures
Use/Nature
of Work
rffi'~~ =W'Œ,"~Œ'
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1514800000
Valuation
$766.00
Plan Approval
$0.00
Permit Fees
Issued By
Date 12/05/2005
in the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
AgenUOWner
OSHKOSH
Telephone Number 231-1750
WI 54901 - 4431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.