Loading...
HomeMy WebLinkAbout0117499-Plumbing (water heater) 0 OSHKOSH ON THE WATER Job Address 912W8THAVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner RONALD ULiSA K BEHLMAN Category 411 - Residential-Water Heaters No 117499 Create Date 12/05/2005 Plan Bathtub 0 Shower 0 Water Softner 0 Wait St. 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Misc. 0 Fixtures Use/Nature r'" ~ W'IT,"~~ of Work Shamp Sink ~ Flr/Wst Sink ~ Catch Basin 0 Wash Ftn ~ Urinal ~ Standp Rec ~ Ice Maker 0 Gar Drain ~ Soda Disp 0 Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Size Material Type Conn. Type Sanitary Sewer Storm Sewer Water Service # 0 0 0 0 0 0 0 0 0 0 Parcelld # 0605580000 Valuation $600.00 $0.00 $20.00 D Permit Voided I Permit Fees Plan Approval Issued By Date 12/05/2005 In the performance of this work, I a9ree to perform all work pursuant to rules 90veming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, .the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.