Loading...
HomeMy WebLinkAbout0000895-Electric (service change) Architect General Cont. Mason - Carpenter Heating Electric Plumbing <I - Address Lot Type of Permit: Nature of Work: BUILDING Use Roof- No. of Rooms Size - Width- Height: Stories Inspections - Footing Sewer N~ 895 Code Floodplain Permit .e~te fC-uZo-1? Zoning Main to Curb: Main to Curb Sq. Ft. Sewer Fees (ReM 01 Lot) Water Service Bath Tub Floor Drain - Urinal Wash Basin - Garbage Disp. - S. Sink Water Closet - Dish Washer - Catch Basin Kit. Sink Laundry Mach.- S. Pump Water Heater_Water Soft. -'------ B & S Waste - Shower Bath~ Bubbler Conductors - Plumbing Fees Total Fees Width ofLot Am 01 Lot 5q. Ft. ~ I _It. HEATING CONTRACTOR Fuel: Gas D Oil D Elec. D Solar D Solid D Conditioning Forced Air D H.W. D Elec. Base D Steam D System Gravity D Supplementary D Air Condo D Chimney: "A" D "B" D Direct Vent D Con. Burner D Calculated Heat Loss System BTU Rating _it. .3 0 <5 g- o ~ ELECTRIC CONTRACTOR Electric Service: New ' , Changes ~ Temp. Description-Type~l~ ~ VoltsZ:i:""-~Q Amps~ Fixtures Switches Recep's Circ's Appliances (Front ofLot) No. Signs S"eet Foundation Electric Service ~ ";--,2-79 ~timated Cost ,/<60...E::!J.-- Final ¡, Fees Paid ':4....,,3..-f!::Q- Date MAy 1 0 197.~ Water Service R.I. In the performance of this work the undersigned agrees to abide by and do work pursuant to all statutes, ordinances, codes, and rules governing the above described construction. ~ c#-P~t?:r:: k-- ~ ~;;!;IO( ,:J; ~