HomeMy WebLinkAbout0117462-Building (roof/siding)
e
OSHKOSH
ON THE WATER
Job Address 2007 CRANE ST
CITY OF OSHKOSH
No
117462
BUILDING PERMIT. APPLICATION AND RECORD
Owner HAROLD UCLARA SCHAFFER
Create Date
12/02/2005
Designer
Contractor
PETERS HOME IMPROVEMENTS
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----.Q Sq. Ft.
----.Q Sq. Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Canopies
Finished/Living
Bedrooms
Stories
Garage
----.Q Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units -----.2
# Structures
-----.2
Use/Nature ~FRfTear off and replace roofing on house and garage. Replace wood siding with vinyl on garage only. NO STRUCTURAL CHANGES.
of Work EIV NOT APPLICABLE.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$8.500.00 Plan Approval
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Issued By:
Date 12/02/2005
Final/O.P. DO/DO/DODO
0 Permit Voided I
Parcelld # 1215510000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this rmit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) an secure any necessary appæals before starting such activity.
Signature ~Þ¡!11~ 1. tA/
,/ Agent/Owner
Date ).!.~ j - tJ S-
Address 2017 CRANE ST
OSHKOSH
~ 54901 - 2150 Telephone Number
920-426-1563
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.