Loading...
HomeMy WebLinkAbout0117462-Building (roof/siding) e OSHKOSH ON THE WATER Job Address 2007 CRANE ST CITY OF OSHKOSH No 117462 BUILDING PERMIT. APPLICATION AND RECORD Owner HAROLD UCLARA SCHAFFER Create Date 12/02/2005 Designer Contractor PETERS HOME IMPROVEMENTS Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.Q Sq. Ft. ----.Q Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Canopies Finished/Living Bedrooms Stories Garage ----.Q Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units -----.2 # Structures -----.2 Use/Nature ~FRfTear off and replace roofing on house and garage. Replace wood siding with vinyl on garage only. NO STRUCTURAL CHANGES. of Work EIV NOT APPLICABLE. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8.500.00 Plan Approval $0.00 Permit Fee Paid $68.00 Park Dedication $0.00 Issued By: Date 12/02/2005 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 1215510000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this rmit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) an secure any necessary appæals before starting such activity. Signature ~Þ¡!11~ 1. tA/ ,/ Agent/Owner Date ).!.~ j - tJ S- Address 2017 CRANE ST OSHKOSH ~ 54901 - 2150 Telephone Number 920-426-1563 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.