Loading...
HomeMy WebLinkAbout2005-Building (windows) e OSHKOSH ON THE WATER Job Address 109W23RDAVE CITY OF OSHKOSH No 117458 BUILDING PERMIT - APPLICATION AND RECORD Owner ANDREAJ LAURY Create Date 12/02/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ----2 Sq. Ft. Rooms Height 0 Ft. Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR / REPLACE 14 WINDOWS SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES of Work OWNERS NAME CHAGE HAS NOT BEEN REFLECTED FOR PROPERTY OWNERSHIP, ANDREA BRITZ HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,500.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 12/02/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1403200000 In the performance of this work I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessa~ approvals before starting such activity. Signature a.ø¿14j(~ AgenUOwner Date /~j,'f)/a1 I , Address 109 W 23RD AVE OSHKOSH WI 54902 - 7036 Telephone Number 9;1.0 .<.¡;;I.1:,--;)../7« To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.