HomeMy WebLinkAbout2005-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 109W23RDAVE
CITY OF OSHKOSH
No
117458
BUILDING PERMIT - APPLICATION AND RECORD
Owner ANDREAJ LAURY
Create Date
12/02/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ----2 Sq. Ft. Rooms Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories
Garage ----2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFR / REPLACE 14 WINDOWS SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES
of Work OWNERS NAME CHAGE HAS NOT BEEN REFLECTED FOR PROPERTY OWNERSHIP, ANDREA BRITZ
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4,500.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Issued By:
Date 12/02/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1403200000
In the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessa~ approvals before starting such activity.
Signature a.ø¿14j(~
AgenUOwner
Date /~j,'f)/a1
I ,
Address 109 W 23RD AVE
OSHKOSH
WI 54902 - 7036
Telephone Number
9;1.0 .<.¡;;I.1:,--;)../7«
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.