HomeMy WebLinkAbout0117459-Building (kitchen cabinets)
e
OSHKOSH
ON THE WATER
Job Address 1235 W 10TH AVE
CITY OF OSHKOSH
No
117459
BUILDING PERMIT - APPLICATION AND RECORD
OWner ROBERTT JUNGWIRTH
Create Date
12/02/2005
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Finished/Living
Bedrooms 0
Stories
0 Projection I
Cahopies
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
Garage
~Sq.Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Use/Nature SFR\ Replace kitchen cabinets & repair wall-covering as needed.
ofWork
Flood Plain -
# Dwelling Units ~
Height Permit
Occupancy Permit
Park Dedication
# Structures
0
HVAC Contractor
Plumbing Contractor
Electric Contractor
SECKAR ELECTRIC CO INC
Fees: Valuation
Issued By: h514'
,
$7,500.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 12/02/2005
Final/D.P. 00/00/0000
0 Permit Voided i
Parcelld # 1307900000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described In this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature #~;é&'~l'~-
Agent/Owner
Date / <?- 2- òO::-
Address
1235 W 10TH AVE
OSHKOSH
WI 54902 - 6215
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.