HomeMy WebLinkAbout0117455-Plumbing
~
OSHKOSH
ON THE WATER
Job Address 1319 BAY SHORE DR
CITY OF OSHKOSH
No
117455
PLUMBING PERMIT - APPLICATION AND RECORD
OWner PAUL UBARBARA LOWRY
Create Date 10/20/2005
Contractor O'NEILL ENTERPRISE INC
Category 410 - Residential-Interior
Plan
Bathtub 0 Shower 0 Water Sollner 0 Wait.St. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest ~ FlrlWst Sink 0 Int Grease Trap 0
Lavatory ~ Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink ~ Wash Ftn 0 RPZValve ~
Res. Sink 1 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal ~ Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater ~ Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters ~
Site Drain 0 Breakrm Sink ~ DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs ~
Roof Drain 0 Ejector/Grind ~ Drink Ftn ~ Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
r~-'""'-
Size
Material
Type
#
Conn. Type
Sanitary Sewer
0
0
0
0
0
0
0
0
0
0
Storm Sewer
Water Service
$400.00
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$20.00 D. Permit Voided I
Parcelld #
0803630000
Valuation
Issued By
Date 12/01/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522 W 6TH AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number 920.230-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.