HomeMy WebLinkAbout0117430-Building (foundation loading docks)
G
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117430
Owner OSHKOSH TRUCK CORP
Create Date
11/10/2005
Designer
Contractor
FLUOR BROS CONSTRUCTION CO
Category
211 - Alteration Industrial
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ---2 Sq. Ft. Rooms
Finished/Living ---2 Sq. Ft. Bedrooms 0
Garage ---2 Sq. Ft. Baths
Height
0 Ft.
D Projection I
Canopies
Stories 1
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units --2
# Structures
0
Use/Nature Factory / Foundation and Concrete work to create 3 loading docks along south wall.. Door openings and door Installation by others.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$256.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 11/30/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1519600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 203 OTTER AVE
AgenVOwner
OSHKOSH
WI 54901 - 0000
Telephone Number
231-6260
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.