Loading...
HomeMy WebLinkAbout0117430-Building (foundation loading docks) G OSHKOSH ON THE WATER Job Address 2737 HARRISON ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117430 Owner OSHKOSH TRUCK CORP Create Date 11/10/2005 Designer Contractor FLUOR BROS CONSTRUCTION CO Category 211 - Alteration Industrial Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---2 Sq. Ft. Rooms Finished/Living ---2 Sq. Ft. Bedrooms 0 Garage ---2 Sq. Ft. Baths Height 0 Ft. D Projection I Canopies Stories 1 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units --2 # Structures 0 Use/Nature Factory / Foundation and Concrete work to create 3 loading docks along south wall.. Door openings and door Installation by others. of Work HVAC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $256.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 11/30/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1519600000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 203 OTTER AVE AgenVOwner OSHKOSH WI 54901 - 0000 Telephone Number 231-6260 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.