Loading...
HomeMy WebLinkAbout0117440-Plumbing e OSHKOSH ON THE WATER Job Address 320 NEAGLE ST Contractor SBS PLUMBING LLC CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 1 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Use/Nature of Work r'. "~" ~~O" 0 0 0 1 1 0 0 0 0 Water Softner Local Waste Clothes Wshr Owner JANE SEEFELD KATSUNE No 117440 Create Date 11/30/2005 Category 410 - Residential-Interior Plan 0 0 0 0 0 0 0 0 0 Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 0 0 0 0 0 0 0 0 Shamp Sink ~ FlrlWstSink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Sanitary Sewer Size Storm Sewer Water Service Material Type # 0 0 0 0 0 Conn. Type Parcelld # 1608940000 Valuation $800.00 $21.00 0 Permit Voided I $0.00 Plan Approval Issued By Permit Fees Date 11/30/2005 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongiy urges the permit applicant to contact the easement holder(s} and to secure any necessary approvals before starting such activity. Signature Date Telephone Number Address Agent/Owner OSHKOSH WI 54901 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.