Loading...
HomeMy WebLinkAbout0117431-Building e OSHKOSH ON THE WATER Job Address 320 NEAGLE ST CITY OF OSHKOSH No 117431 BUILDING PERMIT - APPLICATION AND RECORD Owner JANE SEEFELD KATSUNE Create Date 11/30/2005 Designer Contractor P & N CONSTRUCTION LLC Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ----2 # Structures 0 Park Dedication Use/Nature ßFRI Remodeling the kitchen, removing the existing soffits, and installing new cabinets. No walls are being moved. Firestops may be of Work required to be installed. HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor UNKNOWN???? Fees: Valuation \LAf. Issued By: ~~ $15,000.00 Plan Approval $0.00 Penmit Fee Paid $99.00 Park Dedication $0.00 Date 11/30/2005 FinaIlO.P. 00/00/0000 0 Permit Voided I Parcelld # 1608940000 In the perfonmanee of this work I agree to perform all work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to e~<¡an9 eeess appro s before s!;,rting such activity. Signature Agent/Owner Oshkosh Date ~// be/os Address PO BOX 2244 WI 54903 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.