HomeMy WebLinkAbout0117431-Building
e
OSHKOSH
ON THE WATER
Job Address 320 NEAGLE ST
CITY OF OSHKOSH
No
117431
BUILDING PERMIT - APPLICATION AND RECORD
Owner JANE SEEFELD KATSUNE
Create Date
11/30/2005
Designer
Contractor
P & N CONSTRUCTION LLC
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ----2
# Structures
0
Park Dedication
Use/Nature ßFRI Remodeling the kitchen, removing the existing soffits, and installing new cabinets. No walls are being moved. Firestops may be
of Work required to be installed.
HVAC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor
UNKNOWN????
Fees: Valuation \LAf.
Issued By: ~~
$15,000.00 Plan Approval
$0.00 Penmit Fee Paid
$99.00 Park Dedication
$0.00
Date 11/30/2005
FinaIlO.P. 00/00/0000
0 Permit Voided I
Parcelld # 1608940000
In the perfonmanee of this work I agree to perform all work pursuant to rules governing the described construction,
While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to e~<¡an9 eeess appro s before s!;,rting such activity.
Signature
Agent/Owner
Oshkosh
Date ~// be/os
Address PO BOX 2244
WI 54903 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.