Loading...
HomeMy WebLinkAbout0117433-Building (landing) e OSHKOSH ON THE WATER Job Address 1081 BIRCH LN CITY OF OSHKOSH No 117433 BUILDING PERMIT. APPLICATION AND RECORD Owner URSULA M MAURER Create Date 11/30/2005 Designer Contractor QUALITY 1ST CaNST Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. 0 Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units 0 # Structures ~ Park Dedication Use/Nature of Work FRI Remove rear covered porch. A code compliant, frost protected ianding shall be provided to serve this exit. If a deck is constructed seperate permit is required to be obtained. HVAC Contractor Plumbing Contractor Electric Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Fees: Valuation Issued By: cw Date 11/30/2005 Final/O.P. 00/0010000 0 Permit Voided I Parcelld # 1519629800 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has authority to enforce easement restricllons of which it is not a party, if you perform the work described in this permit aJ'plica~ n within an eas ment, t e City strongly urges the permit applicant to contact the easement :~::e::~r:nd to secure y ne I ss;::pprov.. ef~ Date I ( ~/4 ç {/ Agent/Owner I Address 804 E CUSTER AVE Oshkosh WI 54901 - 0000 Telephone Number 231-5697 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.