HomeMy WebLinkAbout0117433-Building (landing)
e
OSHKOSH
ON THE WATER
Job Address 1081 BIRCH LN
CITY OF OSHKOSH
No
117433
BUILDING PERMIT. APPLICATION AND RECORD
Owner URSULA M MAURER
Create Date
11/30/2005
Designer
Contractor
QUALITY 1ST CaNST
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
0 Projection I
Finished/Living
Canopies 0
Garage
~Sq.Ft.
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
~
Park Dedication
Use/Nature
of Work
FRI Remove rear covered porch. A code compliant, frost protected ianding shall be provided to serve this exit. If a deck is constructed
seperate permit is required to be obtained.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
cw
Date 11/30/2005
Final/O.P. 00/0010000
0 Permit Voided I
Parcelld # 1519629800
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has authority to enforce easement restricllons of which it is not a party, if you perform the work
described in this permit aJ'plica~ n within an eas ment, t e City strongly urges the permit applicant to contact the easement
:~::e::~r:nd to secure y ne I ss;::pprov.. ef~ Date I ( ~/4 ç
{/ Agent/Owner I
Address 804 E CUSTER AVE Oshkosh WI 54901 - 0000 Telephone Number 231-5697
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.