Loading...
HomeMy WebLinkAbout0117434-Building (Interior/Exterior repairs) e OSHKOSH ON THE WATER Job Address 50 W 11TH AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117434 OWner CHARLES P MORTENSON Create Date 11/30/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Required Flood Plain Height Penmit Park Dedication # Dwelling Units -----'! # Structures -----'! Use/Nature SFRI Repairs to home: Resheet and shingle roof; repair/replace siding, soffit, facia as needed; of Work þbandon rear kitchen entrance; rebuild basement entrance; replace entrance doors; replace 11 windows; repair wall, ceiling, floor ~urfaces. Other misc. rep airs as needed. HVAC Contractor Plumbing Contractor Fees: Valuat $10,780.00 Plan Approval $0.00 Penmit Fee Paid $79.00 Park Dedication $0.00 Issued By: Date 11/30/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0302500000 In the perfonmance of this work I agree to per/onm all work pursuant to rules goveming the described construction. While Ihe City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you per/onm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s} and to secure any necessary approvals before starting such activity. Signature V ~.::-.... r 7- Agent/Owner Date ¡ f /-1o/ds Address 50W11THAVE Oshkosh WI 54902 - 6010 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.