HomeMy WebLinkAbout0117412-Building (misc. interior)
0
OSHKOSH
ON THE WATER
Job Address 96 W WAUKAU AVE
CITY OF OSHKOSH
No
117412
BUILDING PERMIT - APPLICATION AND RECORD
OWner 96 W WAUKAU LLC
Create Date
11/28/2005
Designer
Contractor
OWNER
Category
211 - Alteration Industrial
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
OFt.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Signs
Garage
~Sq.Ft.
Baths
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Penmit Not Required
Not Required
# OWelling Units ~
# Structures
~
Park Dedication
Use/Nature INO/ Remodel office area, new wall finish in bathroom, install windows, change back window into a door, finish sheetrocking of walls.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
12,000.00 Plan Approval
$0.00 Permit Fee Paid
$84.00 Parik Dedication
$0.00
Issued By:
Date 11/28/2005
Final/O.P. DO/DO/DODO
0 Permit Voided I
Parcelld # 1413200100
In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and þ-Ses;~e any necessary approvals before starting such activity.
Signature IJOIA_- l '7 L-
Agent/Owner
Date //-()..f>.,-6."
Address 2846 STONEY BEACH ST
OSHKOSH
WI 54902 - 0000
Telephone Number :3 'icy - D R6 Î--,
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.