Loading...
HomeMy WebLinkAbout0117412-Building (misc. interior) 0 OSHKOSH ON THE WATER Job Address 96 W WAUKAU AVE CITY OF OSHKOSH No 117412 BUILDING PERMIT - APPLICATION AND RECORD OWner 96 W WAUKAU LLC Create Date 11/28/2005 Designer Contractor OWNER Category 211 - Alteration Industrial Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height OFt. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies Signs Garage ~Sq.Ft. Baths 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Penmit Not Required Not Required # OWelling Units ~ # Structures ~ Park Dedication Use/Nature INO/ Remodel office area, new wall finish in bathroom, install windows, change back window into a door, finish sheetrocking of walls. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 12,000.00 Plan Approval $0.00 Permit Fee Paid $84.00 Parik Dedication $0.00 Issued By: Date 11/28/2005 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 1413200100 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and þ-Ses;~e any necessary approvals before starting such activity. Signature IJOIA_- l '7 L- Agent/Owner Date //-()..f>.,-6." Address 2846 STONEY BEACH ST OSHKOSH WI 54902 - 0000 Telephone Number :3 'icy - D R6 Î--, To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.