Loading...
HomeMy WebLinkAbout0117407-Building 0 OSHKOSH ON THE WATER Job Address 62 BROAD ST CITY OF OSHKOSH No 117407 BUILDING PERMIT. APPLICATION AND RECORD Owner MICHAEL J SCHETTL Create Date 02107/2005 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Finished/Living --2. Sq. Ft. --2. Sq. Ft. Rooms Height --2. Ft. 0 Projection I Unfinished/Basement Bedrooms 0 Stories Canopies 0 Garage --2. Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Use/Nature ~FRI Kitchen and bathroom remodel. Moving a non bearing wall in the bathroom to make this room larger and opening a wall in the of Work kitchen. all headers must be sized appropriately to carry all loads imposed. This permit does not include elec or plumbing. Reissue permit from before. # Dwelling Units ~ # Structures 0 Park Dedication HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,500.00 Plan Approval Issued By: $1< $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 11/25/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0801320000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agenl/Owner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.