HomeMy WebLinkAbout0117407-Building
0
OSHKOSH
ON THE WATER
Job Address 62 BROAD ST
CITY OF OSHKOSH
No
117407
BUILDING PERMIT. APPLICATION AND RECORD
Owner MICHAEL J SCHETTL
Create Date
02107/2005
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Finished/Living
--2. Sq. Ft.
--2. Sq. Ft.
Rooms
Height --2. Ft.
0 Projection I
Unfinished/Basement
Bedrooms 0
Stories
Canopies 0
Garage
--2. Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Use/Nature ~FRI Kitchen and bathroom remodel. Moving a non bearing wall in the bathroom to make this room larger and opening a wall in the
of Work kitchen. all headers must be sized appropriately to carry all loads imposed. This permit does not include elec or plumbing. Reissue
permit from before.
# Dwelling Units ~
# Structures
0
Park Dedication
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $4,500.00 Plan Approval
Issued By: $1<
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 11/25/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0801320000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
Agenl/Owner
Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.