Loading...
HomeMy WebLinkAbout0117386-HVAC (furnace) e OSHKOSH ON THE WATER Job Address 1857 MCCURDY ST CITY OF OSHKOSH HVAC PERMIT - APPLICATION AND RECORD No 117386 OWner ALFRED/JOAN NIMKE JR Create Date 11/23/2005 Plan Contractor AIR TECH HEATING INC Fuel 1,,11 Gas System 0 New ~ Forced Air I I Electric Chimney Type Chimney A Heat Loss K ) As Approved BTU Rate K ) As Per Pian Category 500 - Residentiai-Heating & Ventilating I I Electric PI Repiace U Steam I I Suppi. I I Soiar I I Solid I I Oil Chimney B . Existing ( ) Variable Direct Vent ( ) Not Appiicabie 0 Other U AlC I U Vent I I Con. Burner I Not Applicabie U Radiant I I HotWater Value . Other Value 60000 Use/Nature FRI replace furnace, NO CHIMNEY LINER being instaiied -- of Work Where an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shaii be resized as necessary to control ue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draf Fees: Valuation $2,750.00 Plan Approval $0.00 Permit Fee Paid $47.00 Issued By: Date 11/23/2005 0 Pennit Voided I Parcelld # 1408460000 In the performance of this work, I agree to perfonn ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1305A INDUSTRIAL PKWY FOND DU LAC WI 54937-0 Telephone Number 920-924-6742 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.