HomeMy WebLinkAbout0117386-HVAC (furnace)
e
OSHKOSH
ON THE WATER
Job Address 1857 MCCURDY ST
CITY OF OSHKOSH
HVAC PERMIT - APPLICATION AND RECORD
No
117386
OWner
ALFRED/JOAN NIMKE JR
Create Date 11/23/2005
Plan
Contractor AIR TECH HEATING INC
Fuel 1,,11 Gas
System 0 New
~ Forced Air
I I Electric
Chimney Type Chimney A
Heat Loss K ) As Approved
BTU Rate K ) As Per Pian
Category 500 - Residentiai-Heating & Ventilating
I I Electric
PI Repiace
U Steam
I I Suppi.
I I Soiar
I I Solid
I I Oil
Chimney B
. Existing
( ) Variable
Direct Vent
( ) Not Appiicabie
0 Other
U AlC I U Vent
I I Con. Burner I
Not Applicabie
U Radiant
I I HotWater
Value
. Other
Value 60000
Use/Nature FRI replace furnace, NO CHIMNEY LINER being instaiied --
of Work Where an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shaii be resized as necessary to control
ue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draf
Fees: Valuation
$2,750.00
Plan Approval
$0.00
Permit Fee Paid
$47.00
Issued By:
Date 11/23/2005
0 Pennit Voided I
Parcelld # 1408460000
In the performance of this work, I agree to perfonn ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
1305A INDUSTRIAL PKWY
FOND DU LAC
WI 54937-0
Telephone Number
920-924-6742
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.