Loading...
HomeMy WebLinkAbout0117398-Building e OSHKOSH ON THE WATER Job Address 100 N MAIN ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117398 Owner AKO OSHKOSH/PARKVIEW OSHKOSH/OSH~ Create Date 11/23/2005 Designer Robert Accord Contractor GANTHER CONSTRUCTION Category 205 - Alteration Amusement, Social, Recreation Plan R3-107-1105 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: 2A Rooms 0 Height ~Ft. Bedrooms 0 Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Finished/Living ~Sq.Ft. 3400 Sq. Ft. 0 Projection I Canopies ~ Unfinished/Basement Garage ~Sq.Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Required Flood Plain No Height Permit Not Required Use/Nature Comm/ Alterations to create space for "Cranky Pats Resturant" as per State Transaction iD # 1201986 of Work Not Required # Dwellin9 Units ~ # Structures ~ Park Dedication HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 84,845.00 Plan Approval $0.00 Permit Fee Paid $319.00 Park Dedication $0.00 Issued By: Date 11/23/2005 FinaI/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0800570000 In the performance of this work i a9ree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement. ! holder(s) and to secure any ne sary pp Is before starting such activity. I Signature ,-' Date tl J.- '3 ~ r Agent/Owner V Address 4825 CTY TRK A OSHKOSH WI 54901 - 0000 Telephone Number 426-4774 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.