HomeMy WebLinkAbout0117398-Building
e
OSHKOSH
ON THE WATER
Job Address 100 N MAIN ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117398
Owner AKO OSHKOSH/PARKVIEW OSHKOSH/OSH~ Create Date
11/23/2005
Designer
Robert Accord
Contractor
GANTHER CONSTRUCTION
Category
205 - Alteration Amusement, Social, Recreation
Plan R3-107-1105
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const: 2A
Rooms 0 Height ~Ft.
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Size
Zoning
Finished/Living
~Sq.Ft.
3400 Sq. Ft.
0 Projection I
Canopies ~
Unfinished/Basement
Garage
~Sq.Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Use/Nature Comm/ Alterations to create space for "Cranky Pats Resturant" as per State Transaction iD # 1201986
of Work
Not Required
# Dwellin9 Units ~
# Structures
~
Park Dedication
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
84,845.00 Plan Approval
$0.00 Permit Fee Paid
$319.00 Park Dedication
$0.00
Issued By:
Date 11/23/2005
FinaI/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0800570000
In the performance of this work i a9ree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement. !
holder(s) and to secure any ne sary pp Is before starting such activity. I
Signature ,-' Date tl J.- '3 ~ r
Agent/Owner V
Address 4825 CTY TRK A
OSHKOSH
WI 54901 - 0000
Telephone Number
426-4774
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.