HomeMy WebLinkAbout0117391-HVAC (furnaces)
e
OSHKOSH
ON THE WATER
Job Address 1316EASTMANST
CITY OF OSHKOSH
No
117391
HVAC PERMIT - APPLICATION AND RECORD
Owner
THOMAS G PUTZER
Create Date 11/23/2005
Plan
Contractor STEINBRUNER HEATING & COOLING
1v'1 Gas I I Oil
Fuel
System n New I
~ Forced Air U Radiant
I I Electric I I Hot Water
Chimney Type K) Chimney A . Chimney B
Heat Loss K ) As Approved . Existing
BTU Rate K) As Per Plan ( ) Variable
Category 500 - Residential-Heating & Ventilating
I I Solar
I I Solid
I I Electric
Pl Replace
U Steam
I I Suppl.
()DlrectVent
n Other
U AlC I U Vent
I I Con. Burner I
( ) Not Applicable
( ) Not Applicable
. Other
Value
Value 45000 ea
Use/Nature DUPLEX! Replace 2 fumaces - No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS
of Work ¡"PPLIANCEWhere an appliance is penmanenlly disconnected from an existing chimney or vent (CN), the CN shall be resized as
necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draft.
Fees: Valuation
$2,500.00
Plan Approval
$0.00
Permit Fee Paid
$42.50
Issued By:
Date 11/23/2005
D Permit Voided I
Parcelld # 1506250000
In the performance of this work, I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
600 OREGON ST
OSHKOSH
WI 54902-0
Telephone Number
(920) 426-1830
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.