Loading...
HomeMy WebLinkAbout0117391-HVAC (furnaces) e OSHKOSH ON THE WATER Job Address 1316EASTMANST CITY OF OSHKOSH No 117391 HVAC PERMIT - APPLICATION AND RECORD Owner THOMAS G PUTZER Create Date 11/23/2005 Plan Contractor STEINBRUNER HEATING & COOLING 1v'1 Gas I I Oil Fuel System n New I ~ Forced Air U Radiant I I Electric I I Hot Water Chimney Type K) Chimney A . Chimney B Heat Loss K ) As Approved . Existing BTU Rate K) As Per Plan ( ) Variable Category 500 - Residential-Heating & Ventilating I I Solar I I Solid I I Electric Pl Replace U Steam I I Suppl. ()DlrectVent n Other U AlC I U Vent I I Con. Burner I ( ) Not Applicable ( ) Not Applicable . Other Value Value 45000 ea Use/Nature DUPLEX! Replace 2 fumaces - No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS of Work ¡"PPLIANCEWhere an appliance is penmanenlly disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draft. Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $42.50 Issued By: Date 11/23/2005 D Permit Voided I Parcelld # 1506250000 In the performance of this work, I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 600 OREGON ST OSHKOSH WI 54902-0 Telephone Number (920) 426-1830 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.