HomeMy WebLinkAbout0117379 B
0
OSHKOSH
ON THE WATER
Job Address 1525 TAFT AVE
CITY OF OSHKOSH
No
117379
BUILDING PERMIT - APPLICATION AND RECORD
Owner PAUL RIKRISTINE NITZ
Create Date
11/22/2005
Designer
Contractor
SURE-DRY-BASEMENT SYSTEMS INC
Category
141 - Exterior Remodeling
Plan
Type
. Buiiding
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Livin9 ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature
ofWork
FR/Installing 6 Grip-Tite wall anchors along the east foundation wall.
HVAC Contractor
Plumbin9 Contractor
Electric Contractor
Fees: Val,\ati'jf',.-
Issued By: ~
$3,570.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Date 11/22/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1604710100
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to s e any necessary ap rovals before starting such activity. .1 /
Signature Date ~/I/;;¿ZIO5
AgenUOwner
Address 754 W AIRPORT RD
MENASHA
WI 54952 - 1409
Telephone Number
920-967-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.