Loading...
HomeMy WebLinkAbout0117379 B 0 OSHKOSH ON THE WATER Job Address 1525 TAFT AVE CITY OF OSHKOSH No 117379 BUILDING PERMIT - APPLICATION AND RECORD Owner PAUL RIKRISTINE NITZ Create Date 11/22/2005 Designer Contractor SURE-DRY-BASEMENT SYSTEMS INC Category 141 - Exterior Remodeling Plan Type . Buiiding 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Livin9 ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature ofWork FR/Installing 6 Grip-Tite wall anchors along the east foundation wall. HVAC Contractor Plumbin9 Contractor Electric Contractor Fees: Val,\ati'jf',.- Issued By: ~ $3,570.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Date 11/22/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1604710100 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to s e any necessary ap rovals before starting such activity. .1 / Signature Date ~/I/;;¿ZIO5 AgenUOwner Address 754 W AIRPORT RD MENASHA WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.