Job Scope
P4Ç~
FIRE PROTECTION &
~ MECHANICAL CONTRACTORS
N6114CO\JN1Y ffIIV ca, APl'lElON, Wl54914-B598' (92O)731.52!!1 FAX; (920) 731-3412
Monday, Febrllary 26, 2001
City ofOshkosh
215 Church Avenue
PO Box 1130
Oshkosh, Wisconsin 54902.1130
Attention:
Allyn Dannhoff
Director of Code Enfurcement
Subject:
Morgan Products 2001 Plant Modifications
Pace Job 8031-01
Dear Allyn,
As we discussed, the following is a outline of the work we will perfO1Dl at Morgan. I did not
expect this wock to start until spring, but several boiler house personnel have left due to the
eminent decommissioning of the wood boilers., and the customer is desperate for beat ftom
another source (gas). We are working on the State Approval drawings.
We will perform the following work:
BuildÎIU!: 8
. Add one gas fired, sealed combustion boiler for I" and 2nd floors, in addition to the
existing boiler next to the compressor room.
. Add gas fired, power vented unit heaters foe 2 bathl'oolD3. To replace existing hot
water radiators.
Building 7
. Add gas unit heaters to production and storage areas.
. Humidi1Y building.
02/26/01
14:21
PACE CORPORATION + 19202365106P910
Pace #8031-01 P.]
BuU'¡¡np'G
. Relocate automatíc valve station for pneumatic humidification system to West wall of
\" floor.
. Replace existing 4" gas main wìth a 2" suspended &om the roof structure.
. Install new gas fired unit heaters to replace the existing steam units.
Building A
. Install new gas fired unit heaters to replace the existing steam units.
. Humidi1ÿ building. High pressure system.
. Install 10,000 CFM direct fired gas makeup air unit. Urnt sized for paint makeup.
Building K
. Install four (4) unit heaters.
. Install humidification system,
. Add one self contained heating and air conditioning unit, PTAC unit, to new office.
New Addition
. Install one single. South wall located air rotation heater with integral humidification
system.
. Ventilation for the restroorns and breakroom.
. Install one continuous 4" air piping header around the perimeter of the building.
. Install 30,000 CFM direct fired gas makeup air uIÙt.
. Engineering and state plans.
. Pen1Ûts and fees fur our work.
NO.412
[;102
02/26/01
14:21
PACE CORPORATION + 19202365106P910
NO.412
[;103
Pace #8031-01 P.3
When the design is complete, we will work though the normal channel. The intent of this
project is to replace the existing steam and hot water, generated by the plant boilers, as soon as
possible befure the boiler house becomes seriously undermanned.
I will be sending the check for the permit this week. Should you require additional in1òrmation
prior to plan ceview, please contact me at (920) 731-5281 or (920) 428;4256 (cell).
Sincerely,