Loading...
HomeMy WebLinkAbout0117371-Building (windows) e OSHKOSH ON THE WATER Job Address 1718 JEFFERSON ST CITY OF OSHKOSH No 117371 BUILDING PERMIT - APPLICATION AND RECORD OWner MARLENE K DEPPE Create Date 11/21/2005 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeiing Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature ofWork FRilnstaiiation of 19 o.h vinyl replacement windows in existing openings - NO STRUCTURAL WORK HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,800.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 11/21/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 1504170000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 625 FOND DU LAC AVE AgenUOWner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.