HomeMy WebLinkAbout0117368-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 1170 HEIDI HAVEN DR
Contractor SBS PLUMBING LLC
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
117368
OWner RUSCH HOMES LLC
Create Date 11/21/2005
Plan
Category 410- Residential-Interior
Bathtub 2 Shower 1 Water Softner 0 Wait St. 0
Whirlpool 0 Floor Drain 1 Local Waste 0 Ice Chest 0
Lavatory 3 Lndry Tray 0 Clothes Wshr 1 Exam Sink 0
Toilet 3 Disposal 1 Bidet 0 Sculry Sink 0
Res. Sink 1 Dishwasher 1 Beer Tap 0 Hand Sink 0
Bar Sink 0 Sump Pump 1 Lab Sink 0 Plaster Sink 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0
'Misc. 2 Hose Bibs
Fixtures
Use/Nature r'.~ mo' ~,.,
of Work
Shamp Sink 0 Coffee Maker 0
Flr/Wst Sink 0 Int Grease Trap 0
Catch Basin 0 Ex! Grease Trap 0
Wash Ftn 0 RPZ Valve 0
Urinal 0 Eye Wash Statn 0
Standp Rec 0 Wtr Sewer Mtrs 0
Ice Maker 0 Deduct Meters 0
Gar Drain 0 Wtr Usage Mtrs 0
Soda Disp 0
Size
Type
Conn. Type
Material
Sanitary Sewer
Storm Sewer
Water Service
#
0
0
0
0
0
Parcelld #
1342954900
Valuation
$7,475.00
$0.00
Permit Fees
$126.00 0 Permit Voided I
Plan Approval
Issued By
Date 11/21/2005
In the performance of this work, i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 3904
Agent/Owner
OSHKOSH
WI 54903 - 3904
Telephone Number
920-410-5933
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.