Loading...
HomeMy WebLinkAbout0117365-Plumbing 0 OSHKOSH ON THE WATER Job Address 1155 HEIDI HAVEN DR CITY OF OSHKOSH No 117365 PLUMBING PERMIT -APPLICATION AND RECORD Contractor SBS PLUMBING LLC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures 1 0 4 3 1 0 1 0 0 2 Shower Floor Drain 2 1 0 1 1 1 0 0 0 Water Softner Local Waste Clothes Wshr Owner RUSCH HOMES LLC Create Date 11/21/2005 Plan Category 410 - Residential-Interior 0 0 1 0 0 0 0 0 0 Wait.St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink 0 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap ----'! RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Hose Bibs Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Use/Nature ofWork I'. ~ -'"~., Valuation Issued By Sanitary Sewer Size Storm Sewer Water Service $6.275.00 Plan Approval Material $0.00 Permit Fees Type # 0 0 0 0 0 Conn. Type 0 0 0 0 0 $133.00 0 Permit Voided I Parcelld # 1342953000 Date 11/21/2005 In the performance of this work. I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongiy urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 920-410-5933 Address PO BOX 3904 Agent/Owner OSHKOSH WI 54903 - 3904 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.