Loading...
HomeMy WebLinkAbout2005-Building (window) ~ OSHKOSH ON THE WATER Job Address 439 W 5TH AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117354 Owner MELVIN L RYMER Create Date 11/21/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fenee 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Canopies ~ Finished/Living Bedrooms Stories Garage ~Sq.Ft. Baths 0 Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units --'1 # Structures --'1 Use/Nature FRI Replacing the picture window located In the living room (same size and location). Tiltin Window Company in Appleton is doing the ofWork Installation. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valua¡i°"Q ¡;- Issued By: ~ $1,950.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 11/21/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0906250000 In the perfonmanee of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s} and to secure any necessary app Is before starting such activity. Signat e Agenl/Owner OSHKOSH Date y /%- 2' . "'::> WI 54902 - 5905 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entrY), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.