Loading...
HomeMy WebLinkAbout0117348-Plumbing (water heater) e CITY OF OSHKOSH No 117348 OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD ON THE WATER Job Address 1315 RAHR AVE Owner Create Date 11/18/2005 Contractor KOCH PLUMBING Category 411 - Residential-Water Heaters Plan Bathtub 0 Shower 0 Water Softner 0 Wait.St. ~ Shamp Sink ~ Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Int Grease Trap ~ Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 1 Classon Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters ~ Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ofWork r"'" , ~,- ~ ~~-, Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 D Permit Voided I Parcelld # 0206960000 $0.00 Permit Fees Valuation $600.00 Plan Approval Issued By Date 11/18/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2005 DOTY ST Agent/Owner OSHKOSH Telephone Number WI 54902 - 0000 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.