HomeMy WebLinkAbout0117348-Plumbing (water heater)
e CITY OF OSHKOSH No 117348
OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD
ON THE WATER
Job Address 1315 RAHR AVE Owner Create Date 11/18/2005
Contractor KOCH PLUMBING Category 411 - Residential-Water Heaters Plan
Bathtub 0 Shower 0 Water Softner 0 Wait.St. ~ Shamp Sink ~ Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Int Grease Trap ~
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 1 Classon Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters ~
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
ofWork
r"'" , ~,- ~ ~~-,
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
0206960000
$0.00
Permit Fees
Valuation
$600.00
Plan Approval
Issued By
Date 11/18/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2005 DOTY ST
Agent/Owner
OSHKOSH
Telephone Number
WI 54902 - 0000
920-231-6661 or 235
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.